Energy & Chemical Communication Solution
For high-risk sites (refining, power plants, oil & gas fields): full-site coverage with production/maintenance/emergency grouped linkage.
3 common energy-chemical radio problems
- 01
Harsh comms requirements:Under leaks/fire, the comms link must be stable and one-call-all.
- 02
Complex plant structure:Towers, pipe racks and tank farms are dense; many shielding and blind spots.
- 03
Slow emergency linkage:Production, maintenance and fire comms are isolated; emergency escalates layer by layer.
KINGTONE energy-chemical solution
Unified plant network; independent production/maintenance/emergency groups.
Fiber covers tank farms and pipe racks; low power, scalable, NMS-managed.
Same-frequency cancellation; eliminates co-frequency interference in dense tower areas.
Links with emergency plan; one-click multi-department conference.
Typical project parameters
| Parameter | Reference value |
|---|---|
| Coverage | Production units + tank farm + pipe rack |
| Groups | Production / Maintenance / Emergency |
| Terminals | 100–600 units |
| Lead time | 30–90 working days |
Figures above are reference values from comparable projects; final configuration is subject to on-site survey and the contracted technical agreement.
Case brief
A petrochemical plant deployed RS3500 digital repeaters + CV410 all-optical network + S300 dispatch: coverage of production units, tank farm and pipe racks; three independent groups (production, maintenance, emergency); in drills, multi-department linked in one click for coordinated response.