SCENE / ENERGY

Energy & Chemical Communication Solution

For high-risk sites (refining, power plants, oil & gas fields): full-site coverage with production/maintenance/emergency grouped linkage.

3 common energy-chemical radio problems

  • 01

    Harsh comms requirements:Under leaks/fire, the comms link must be stable and one-call-all.

  • 02

    Complex plant structure:Towers, pipe racks and tank farms are dense; many shielding and blind spots.

  • 03

    Slow emergency linkage:Production, maintenance and fire comms are isolated; emergency escalates layer by layer.

KINGTONE energy-chemical solution

RS3500 digital repeater

Unified plant network; independent production/maintenance/emergency groups.

CV410 all-optical network

Fiber covers tank farms and pipe racks; low power, scalable, NMS-managed.

CV310 ICS

Same-frequency cancellation; eliminates co-frequency interference in dense tower areas.

S300 dispatch console

Links with emergency plan; one-click multi-department conference.

Typical project parameters

ParameterReference value
CoverageProduction units + tank farm + pipe rack
GroupsProduction / Maintenance / Emergency
Terminals100–600 units
Lead time30–90 working days

Figures above are reference values from comparable projects; final configuration is subject to on-site survey and the contracted technical agreement.

CASE FILE

Case brief

A petrochemical plant deployed RS3500 digital repeaters + CV410 all-optical network + S300 dispatch: coverage of production units, tank farm and pipe racks; three independent groups (production, maintenance, emergency); in drills, multi-department linked in one click for coordinated response.

Other scenario solutions

Call nowGet a Plan